All photos taken at the Tamworth Road site
Bricklaying work this weekend included work on the offside wall between locks 24 and 25 ...
.... and the upper towpath side wing wall of lock 26 (Well the back skin!)
Lots of bricks needed shifting ...
... which meant that Chris, on his first London WRG dig, got in lots of dumper driving practice ...
.... Not all hard work though!!!
Tracey and Suzie on the wing wall ...
... assisted by Nigel.
Being summer Saturday nights meal was a BBQ ...
... and unusually for a London WRG BBQ it didn't rain!
Back on site Helen tries her hand at bricklaying.
The hot weather meant that tea breaks were popular.
Sally joins the wing wall team.
Meanwhile at lock 24 another team is preparing the walls for repair ..
... and exposing the culvert.
Elanor removes damaged brickwork ...
... as does Dave - occasionally!!!
A quoin
The team on the offside wall ..
... which included Osama Bin Johnson